International Wind Engineering

News

 

 

Home
Services
References
News
Links

bullet

3-Sep-03: International Wind Engineering is in the process of completing its quality assurance system according to ISO-DIS17025. We will shortly apply for accreditation of the measurement services offered by the company. This is expected to significantly broaden the measurement department of International Wind Engineering.

bullet

28-Apr-04: International Wind Engineering has been awarded the Accreditation of its Testing Laboratory by DAP (German Accreditation Body) according to DIN EN ISO/IEC 17025:2000. The certificate DAP-PL-3736.00 is valid for the scope of Cup Anemometer Calibrations, Power Curve Measurements and Wind Potential Measurements and Analysis.

bullet

25-Feb-05: Oral presentation with the subject "Technical Monitoring of Wind Turbines for Improved Operational benefits" in the context of the 3rd national conference on Renewables held in Athens (RENES 2005, 23-25.2.2005). The accompanying technical article will be included in the conference proceedings to be issued (in greek).

bullet

 9-Mar-05: The national Secretariat for Research and Development has approved the funding of the company's 2-year project entitled "Development of a Diagnostic Monitoring tool of Wind Turbine Operational Condition" within the PAVET-NE-04 framework of the Operational Program "Competitiveness" co-funded by the EU. The project aims to the development of a mobile data acquisition and analysis system which is installed for a short period on a wind turbine nacelle and identifies the operational condition of the main load-carrying components through fast-sampled acceleration and vibration data and specialized Fourier analysis of the signals.

bullet

May -07: The research project for developing a Diagnostic Monitoring System for Wind Turbine Vibration Analysis has been successfully completed. The system is now available for commercial applications. It comprises ultra sensitive accelerometers and an endoscope for probing the gearbox.

bullet

 June -07: The company has moved to its new private-owned offices in Gerakas district of Athens. New telephone lines are available.

bullet

May 09: A 100 kW, grid-connected PV-plant owned and operated by Morfiadakis Energeiaka Systimata has entered commercial operation is Arkadia, Peloponnese. The company has also commissioned a 20kW PV-plant which it installed on behalf of AB-Vassilopoulos company in its Mega Super Market (Kifissia, National Road Athens-Lamia).

bullet

May 09: The company has been accredited by the Hellenic Accreditation System (ESYD) for Wind Measurements and Cup Anemometer Calibration according to ELOT EN ISO/IEC 17025:2005 (certificate no 547). The previous accreditation by DAP expired as of 27.4.09.

Home | Services | References | News | Links

                                   This site was last updated 23-06-09